• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Yellow Interior Design

Design and project management

  • Welcome
  • Projects
  • What we do
  • About us
  • News
  • Contact Us

Where’s Beretta? 2nd floor, Harrods

September 17, 2018 By robd

Our latest project with Beretta involved the relocation of their concession in Harrods to a new temporary location on the 2nd floor. Harrods is undergoing major alterations within the store to make the layout more logical. This involves some concessions having to move more than once before reaching their final destination. In their first move last year, we redesigned the shopfitting so that it could be dismantled and reconfigured in its new location this year.

The team at Turvey Construction and Joinery Solutions from Waterlooville near Portsmouth, did an amazing job with only 2 days on site to dismantle, move and re-assemble the complete shop. And the slick Beretta team did an equally amazing job of de-stocking and re-stocking overnight ready for opening. Well done guys.

Filed Under: News

Primary Sidebar

Tweets by @JustYellow1

Recent Posts

  • Recycled Material: Innovative Fabrics from Sunbury Design
  • Paint: The environmental impact and how to make greener choices
  • Revisiting Care Home Design Post-COVID
  • The Post-COVID Office: Advice from the Experts
  • Creating cosy pub interiors from scratch

Footer

  • Home
  • What we do
  • Projects
  • About us
  • Contact Us

Yellow
Amberley House
Hungerford Bottom
Old Bursledon
Southampton
SO31 8DF

Tel: 023 80402019 / 07785 726067

Tweets by YellowInteriors

Copyright © 2022 Yellow Interiors · website by Northerwood